413.792 MW (Gas) / 333.02 MW (Fuel Oil) (Net) Dual Fuel Fired Power Generation Facility at Sirajganj
Work Description: Construction of 413.792 MW (Gas) / 333.02 MW (Fuel Oil) (Net) Dual Fuel Fired Power Generation Facility at Sirajganj, Bangladesh (Package 2A & 2B)
View ProjectBibiyana III 400 MW Combined Cycle Power Plant
Work Description: 1. Installation & Testing of 14 nos Test Pile 2. Sand Filling of 2 m Height & Slope Protection 3. Site Office on Turnkey Basis 4. Supply, Installation & Maintenance of 80 Ton Weigh Bridge on Rental Basis...
View Project