413.792 MW (Gas) / 333.02 MW (Fuel Oil) (Net) Dual Fuel Fired Power Generation Facility at Sirajganj
Work Description:
Construction of 413.792 MW (Gas) / 333.02 MW (Fuel Oil) (Net) Dual Fuel Fired Power Generation Facility at Sirajganj, Bangladesh (Package 2A & 2B)
Bibiyana III 400 MW Combined Cycle Power Plant
Work Description:
1. Installation & Testing of 14 nos Test Pile
2. Sand Filling of 2 m Height & Slope Protection
3. Site Office on Turnkey Basis
4. Supply, Installation & Maintenance of 80 Ton Weigh Bridge on Rental Basis
5. Construction of Package B & C of Civil & Architectural Work
6. Construction of River Intake, Jetty, Pump House & Roads
Mass Rapid Transit, Line – 6 (Metro Rail)
Work Description:
Construction of Civil Works for Soil Improvement, Land Development and Retaining Wall for Advance Works of Lake 9 at Uttara Depot MRT Line – 6 (Metro Rail Project)
Sheikh Hasina Software Technology Park, Jessore
Work Description:
Construction of Steel Structure Canteen & Amphitheatre Building of Software Technology Park at Jessore (Package No – JSTP – WD6)