Blog Grid

S. Mukundan, Managing Director, Shapoorji Pallonji Infrastructure Capital Co. Pvt. Ltd visited at our Bhola 220 MW CCPP project on 05 Jan, 2020

Aerial View of Bhola Project on 30. 12. 2019

 

Sheet Pile Removing Works in Progress on 31 December 2019 at Intake Pump Station Structure . Project : BIBIYANA SOUTH 400 MW CCPP, HABIGANJ, SYLHET

 

Aerial View of Bhola Project on 27. 11. 2019

Aerial View of Bhola 220 MW (Gas)/212 MW (HSD) Based Dual Fuel CCPP Project.

Laser Screed Concrete Leveling

  Laser screed concrete leveling equipment recently imported by SINAMM presently using at CKL SPINNING MILL project for floor construction work.

Pile Head Breaking

Pile head breaking equipment used at Bhola 220 MW(Gas)/212 MW(HSD) Based Dual Fuel Combined Cycle Power Plant.

Precast Pile Driving Works

Precast pile driving works at Bhola 220 MW(Gas)/212 MW(HSD) Based Dual Fuel Combined Cycle Power Plant

Pipe Pile Driving Work

Pipe pile driving work at EKL modonpur project.

Contract Signing Event with SAMSAUNG C&T

Contract signing event with SAMSAUNG C&T for pre cast piling works at 718 MW CCPP project at Meghnaghat.

Top Management Visited Bhola Site

Sinamm top management visited Bhola 220/212 MW combined cycle power plant project.