Bhola, Bangladesh
This project involved the construction of a dual fuel combined cycle power plant capable of generating 220 MW using natural gas and 212 MW using high-speed diesel (HSD). The facility was designed to ensure flexible and reliable electricity generation based on fuel availability, boosting energy supply in southern Bangladesh. The scope included engineering, procurement, and construction of civil, mechanical, and electrical components essential for plant operation and grid integration.
NUTAN BIDYUT BANGLADESH LIMITED BISHO INFRA PROJECTS LIMITED (BIPL)
Bhola, Bangladesh
completed
April 2018
December 2019
Power Plant
2300.00 Million BDT