Term Archives: Power Plant

Bibiyana III 400 MW Combined Cycle Power Plant

Work Description:
1. Installation & Testing of 14 nos Test Pile
2. Sand Filling of 2 m Height & Slope Protection
3. Site Office on Turnkey Basis
4. Supply, Installation & Maintenance of 80 Ton Weigh Bridge on Rental Basis
5. Construction of Package B & C of Civil & Architectural Work
6. Construction of River Intake, Jetty, Pump House & Roads

Shikalbaha 150 MW Power Plant

Work Description:
1. Sub-soil Investigation Work
2. Construction of Pile Testing
3. Construction of 2nd Level Over Existing BPDB Rest House Building
4. Construction of Cast in Situ RCC Piling Work

Bibiyana South 400 MW Combined Cycle Power Plant

Work Description:
1. Soil Improvement & Earth Moving Work
2. Monitoring System including Installation of Piezometer
3. Discharge Water Drainage Pipeline Work
4. Temporary Slope Protection Work

Haripur 360 MW Power Plant

Work Description:
1. Gas Turbine Building
2. Gas Turbine Foundation
3. Steam Turbine Building & Foundation
4. Chemical Dosing Shelter
5. Service Gas Shelter
6. Watch Tower
7. Fuel Gas Compressor
8. Electrical Building