Blog

Laser Screed Concrete Leveling
By:

  Laser screed concrete leveling equipment recently imported by SINAMM presently using at CKL SPINNING MILL project for floor construction work.

Pile Head Breaking
By:

Pile head breaking equipment used at Bhola 220 MW(Gas)/212 MW(HSD) Based Dual Fuel Combined Cycle Power Plant.

Precast Pile Driving Works
By:

Precast pile driving works at Bhola 220 MW(Gas)/212 MW(HSD) Based Dual Fuel Combined Cycle Power Plant

Pipe Pile Driving Work
By:

Pipe pile driving work at EKL modonpur project.

Contract Signing Event with SAMSAUNG C&T
By:

Contract signing event with SAMSAUNG C&T for pre cast piling works at 718 MW CCPP project at Meghnaghat.

Top Management Visited Bhola Site
By:

Sinamm top management visited Bhola 220/212 MW combined cycle power plant project.